Gainesville Regional Airport (GNV) completed updates which are not only aesthetically pleasing, but the renovations result in easier accessibility for passengers as well as energy efficiency.
- All non-insulated store front glass has been replaced with energy efficient glass.
- The airport’s main entryways are now vestibules to reduce the loss of air conditioning or heating. The curbside drop off, sidewalks and crosswalks have been redone with a unique pattern of colored cement with curved lines.
- Exterior, pillar lighting was replaced with new, energy efficient LED lighting for energy efficiency and the safety of late arriving travelers.
- Fresh paint, new benches and new landscaping create the new welcome for both residents and visitors to the community.
- The new irrigation system replaced the source from utility domestic water to well water.
- Disabled parking areas and ramps to the sidewalk were repaved at the front of the short term lot.
No comments:
Post a Comment