Saturday, May 19, 2012

Gold Beach Municipal Airport (4S1), Oregon: Taxiway Rehabilitation project

  • Description: The work contemplated consists of, but is not limited to, the following:
    1. Reconstruct Parallel Taxiway
    2. Construct new South Run-up Apron
    3. Perform subgrade exploration, 10 feet below existing taxiway
    4. Install edge drainage system
  • Bid Date: 6/5/12, 1:00 pm PST
  • Walk Thru: 5/24/12, 1:00 pm PST MAP
  • Price: Purchase Prints or Free File Download
  • Refundable: No
  • Project Contact: Architect
  • Addenda: To Be Determined
  • Host: ARC-Portland (503) 227-3424

No comments:

Post a Comment