May 9, 2012 by Dale Ibbotson
Interior
strip down, including dash and instrument panel. Part of a bare metal
refurbishment including all engineering on a 1973 BE55 Baron. Meant to
take 3 months, took nearly a year. Was it worth it? Absolutely, joy to
fly and looks fantastic.
May 9, 2012 by Dale Ibbotson
Some
clips of the interior tear down and rebuild phase of a 1973 Beech Baron
55. This was after the bare metal respray and complete overhaul of all
engineering consumables. Originally a 3 month project that turned into
nearly a year. However, flies like a dream and looks awesome. So was it
worth the effort. Absolutely!
No comments:
Post a Comment